Recycling plants for commercial and mixed construction waste

From the feasibility study and pre-engineering to the turnkey plant. Waltec plans and implements robust, GewAbfV-compliant recycling plants that are designed for maximum efficiency and minimum downtime.

Contact us
Companies in the

A strong partner for leading companies in the recycling and raw materials industry

waltec-nehlsen-logo
waltec-otto-doerner-logo
waltec-veolia-logo

Your investment in secure processes and high profitability

GewAbfV competence

We specialize in concepts in accordance with the latest guidelines and regulations of the Commercial Waste Ordinance (GewAbfV).

Maximum economic efficiency

Our system planning aims to achieve high sorting rates, optimized material flows and maximum profitability for your site.

Minimal downtime

We rely on solid, robust technology and proven components to reduce your operating costs by minimizing downtime.

Holistic engineering

From the feasibility study and pre-engineering to the final system design – we deliver your project as a turnkey solution.

Holistic solutions for your added value

We specialize in the design and implementation of robust, highly efficient systems that precisely meet all legal requirements (GewAbfV).

New commercial and construction mixing plants

The design of turnkey new plants that are precisely tailored to the sorting requirements of the GewAbfV and your site conditions – planned for maximum quotas and profitability.

System expansions & retrofits

Does your site need to grow or meet new requirements? We plan and integrate expansions, conversions and modernizations seamlessly into your existing processes to increase your plant capacity and efficiency.

Modular sub-trades

Conveyor technology, hopper, dosing unit and steel construction – coordinated and easy to service. Integration into existing layouts and process chains without increasing complexity.

Feasibility studies

The solid basis for your investment. We analyze your location, the material flows and the legal framework and prepare a detailed study on the technical and economic feasibility of your project.

System concept & basic design

We develop technical layouts and holistic concepts that take into account all material flows, sorting targets and location factors and form the basis for tailor-made planning.

Pre-engineering

In this detailed planning phase (pre-engineering), our engineers develop the exact technical basis and budget for the final realization of your project.

Air & dedusting technology

Clean operation is essential. We integrate high-performance air and dust extraction systems (e.g. air separators, extraction systems) into our concepts in order to comply with emission specifications and ensure workplace quality.

Realization & commissioning

As part of the Heide Group, we control the entire process. Our sister company, Klamotec GmbH, manufactures the robust components and assembles them on schedule – for guaranteed quality from a single source.

Service, training & spare parts

A system is only as good as its service. We safeguard your investment in the long term – with maintenance, training for your operating personnel and a rapid supply of critical spare parts.

Contact us

Planning and execution from a single source

As your general planner (Waltec), we manage the entire process from the feasibility study to acceptance. The decisive advantage lies in our group of companies: our engineering concepts seamlessly draw on the specialized expertise of our sister company, Klamotec GmbH.

You receive a system concept from Waltec that is designed from the outset for proven, robust and punctual implementation. We eliminate the risks and interface losses that arise between pure planning offices and external implementation companies.

Performance summary of Klamotec GmbH

  • Production of: Conveyor technology, bunkers, feeders, supporting structures – precisely tailored to the Waltec layout.
  • Construction site organization: process control, functional and performance tests, documented acceptance tests.
  • Assembly worldwide: also at weekends, at night and on public holidays; 48-hour start EU-wide.
  • Retrofit & new installation: LVP, commercial and construction mixing lines, relocations, conversions, maintenance.

Engineering fit: AutoCAD Inventor, clean interfaces, fast restarts.

About Klamotec

Guaranteed conformity: your system concept in accordance with GewAbfV

We specialize in the planning and design of systems that precisely comply with all current directives and regulations of the German Commercial Waste Ordinance (GewAbfV).

Compliance with the Commercial Waste Ordinance is the decisive factor for the economic efficiency and sustainability of a recycling plant. Our engineers integrate compliance with all requirements into your concept right from the initial feasibility study.

Precise material flow analysis

Our concepts define and separate all material flows (material streams) exactly as required by the legal regulations for feeding them for sorting.

Achieving the sorting quotas

We plan the plant technology and the process chain specifically to achieve and maintain the prescribed sorting quotas.

Complete documentation

We provide audit-proof technical documentation of all processes and components that you need for official verification.

Guaranteed acceptance reliability

Our expertise in pre-engineering and our focus on compliance eliminate approval risks before they arise and ensure the final, trouble-free acceptance of your system.

Specialists for the most demanding sectors of the circular economy

Our engineering concepts are precisely tailored to operators and investors who need to process complex material flows in accordance with the highest legal and economic standards.

Building rubble & mineral waste

We plan and implement complete systems for processing construction waste and mixed construction waste. Our concepts are aimed at efficiently separating valuable raw materials (e.g. metals, wood) and purifying mineral fractions for recycling.

Commercial waste & sorting residues (GewAbfV)

Our absolute core competence. We specialize in the planning of sorting plants that meet all the requirements of the German Commercial Waste Ordinance (GewAbfV). The focus is on achieving the highest sorting rates and ensuring trouble-free production.

waltec-anlagenbetreiber-investoren

Plant operators & investors

Our partners are large, medium-sized and international recycling companies and investors who are looking for a robust, turnkey and profitable solution for a new site or plant expansion.

Contact us
waltec-stefan-klaus-small

Stefan Klaus

Managing Director
waltec-dirk-van-der-wal-small

Dirk van der Wal

Managing Director

About us - Engineering excellence for the circular economy

Waltec combines in-depth process know-how in recycling with the implementation strength of an experienced manufacturer network. Waltec is not just a machine supplier.

We are a highly specialized engineering team and general planner for large-scale turnkey recycling plants. Our thinking is geared towards the goals of investors and operators: We design plants for construction waste and commercial waste that are designed for maximum efficiency and precise compliance with legal requirements (GewAbfV).

As a Heide Group company, we offer a decisive advantage over pure planning offices. Our engineers plan concepts that are already tailored to the proven, robust components of our group of companies.

For you, this means: no interface losses, guaranteed quality in execution and a system concept that is conceived and realized from a single source, from the first drawing to the last screw.

Find out more about the team

From the idea to a profitable investment

Our structured engineering process safeguards your investment at every stage and guarantees compliance with all legal requirements (GewAbfV).

1

Analysis & feasibility study

It all starts with your goal. Our engineers analyze your location, the planned material flows and the economic viability. In a detailed feasibility study, we assess the profitability and technical requirements of your project.

2

Concept & Pre-Engineering

Based on the analysis, we develop a customized system concept. We create initial technical layouts, define the core components and provide a sound budget as a transparent basis for your investment decision.

3

Detail engineering & compliance

This is where the detailed planning begins. Each component is technically designed and finalized in the CAD system. At the same time, a complete check for GewAbfV conformity is carried out to guarantee the subsequent approval and acceptance of your project.

4

Realization control

As your general planner, we manage the entire construction process. We coordinate the production of the robust components, manage all trades on the construction site and ensure adherence to the time and budget plan through active interface management.

5

Commissioning & long-term support

We do not hand over a construction site to you, but a turnkey, running system. After successful performance tests, we train your operating personnel and remain at your side as a reliable service partner for maintenance, training and spare parts.

Start your system project

Are you planning a new system, an expansion or do you need a feasibility study for your site? Talk to our engineers directly. We can advise you on all aspects of the GewAbfV and the economic viability of your project.

Arrange an engineering meeting now
waltec-start-plant-project

Insights into our realized system solutions

Request for your project

Otto Dörner Hamburg

Plant type: Construction waste and commercial waste processing
Plant capacity: 45 t/h
Specific bulk density: 250-350 kg/m3
Year of construction: 2018
Shifts: 2-shift operation

Nehlsen Bremen

Plant type: Construction waste and commercial waste processing
Plant capacity: 32 t/h
Specific bulk density: 250-350 kg/m3
Year of construction: 2018
Shifts: 2-shift operation

Hufnagel Environmental Service Olpe

Plant type: Commercial waste processing
Plant capacity: 37 t/h
Specific bulk density: 200-280 kg/m3
Year of construction: 2018
Shifts: 3-shift operation

Diba Waste Disposal Hildesheim

Plant type: Commercial waste processing
Plant capacity: 32 t/h
Specific bulk density: 200-280 kg/m3
Year of construction: 2022
Shifts: 1 shift operation

Nehlsen Bremen

Plant type: RDF & commercial waste & residual material processing
Plant capacity: 23 t/h
Specific bulk density: 120-180 kg/m3
Year of construction: 2025
Shifts: 3-shift operation

FAQ - Frequently asked questions

Technical, economic and legal clarity for your plant project – here you will find answers to the most important questions about our engineering process.

Do you have any further questions?

Our engineers are always available for a technical discussion.

Contact us

Talk to our engineers

Do you have technical questions about a feasibility study, a plant expansion or the requirements of the GewAbfV? Choose the direct route to our engineering team here for an initial consultation.

Phone

For a direct technical discussion or to arrange an appointment.
+49 36075 / 579651

Email

Send us your basic project data, initial plans or your inquiry for review.
kontakt@waltec.gmbh

Contact form

Use our form for a structured inquiry about your system concept.
Contact form

Address

Waltec Practical Waste Solutions GmbH
Auf der Heide 11
37351 Dingelstädt